Commercial · New builds, fit-outs & renovations
From site condition to handover ready.
Construction dust doesn't settle once — it settles three times. We do the phased clean that gets a new build genuinely ready for inspection, photography and the people moving in.
- Rough, final & touch-up phases
- Fine dust & residue specialists
- Scheduled around your trades
Written quote back within 24h — Bonded & insured.

Why you can trust Royal Clean Solutions
Bonded & insured
Full coverage on every job, every visit.
Vetted crews
Background-checked before they enter your space.
Eco-friendly products
Low-residue and safer around staff, kids and pets.
Satisfaction guarantee
Not happy? We re-clean it at no extra charge.

The real problem
Construction dust comes back twice after you think it's gone.
Drywall dust is measured in microns. It goes airborne on the smallest disturbance, settles into vents, light fittings, window tracks and the tops of door frames, then falls again days later onto everything you just cleaned.
That's why a single end-of-job wipe-down never holds, and why handovers get delayed while somebody re-cleans a unit that was signed off a week ago. The fix isn't more effort — it's phasing the clean correctly and dealing with the air, not just the surfaces.
Dust that reappears after sign-off.
Cleaned once, disturbed by a trade returning, and back to square one. Phased cleaning prevents the rework.
Damage from the wrong method.
Paint flecks scraped off new glass, grout haze scrubbed into stone, adhesive stripped with the wrong solvent. Surfaces are unforgiving at this stage.
Handover slipping.
Cleaning is the last thing on the programme and the first thing to squeeze the completion date. We schedule to your trades, not ours.
The payoff
What a proper post-construction clean protects
Your handover date
Phased correctly, cleaning stops being the thing that delays completion and starts being the thing that proves it's finished.
Brand-new finishes
Correct method per surface — glass, stone, timber, stainless, powder-coat — so nothing is scratched, hazed or stripped on its first clean.
Breathable air
Fine particulate pulled out of vents, filters and fittings rather than redistributed through the space the first time HVAC runs.
Inspection readiness
Window tracks, door frames, light fittings and edges — exactly the details a snagging inspector checks first.
Photography-ready space
Streak-free glass and genuinely clean floors, so marketing shots and first viewings do the property justice.
Time back for your team
Your trades shouldn't be doing final cleans. Specialist crews finish faster and to a standard that holds.
What's included
What's included in post-construction cleaning
Delivered in phases. Most projects need all three; small renovations often need only the final and touch-up stages.
01Phase 1 — Rough clean
- Remove construction debris, offcuts and packaging
- Sweep and vacuum all floor areas including sub-floors
- Clear stickers, tape and protective film from fixtures
- Wipe down initial dust from high surfaces and ledges
- Clear window and door tracks of grit and debris
- Bag and remove waste to your designated point
02Phase 2 — Final detail clean
- HEPA vacuum every surface, top-down, including vents and returns
- Interior and exterior glass, frames, sills and tracks detailed
- Grout haze, paint flecks and adhesive removed by correct method
- Cabinetry cleaned inside, outside, on top and underneath
- Fixtures, fittings, switch plates and hardware polished
- Floors cleaned to finish standard by material type
03Phase 3 — Touch-up before handover
- Re-clean of all settled dust after trades have finished
- Final glass and mirror pass for streak-free finish
- Restroom and kitchen fixtures polished and sanitised
- Floors re-buffed or re-mopped to presentation standard
- Snag-list walk with your site contact
- Space left ready for inspection, photography or move-in
Need something not on this list?
Every plan is built to your space — tell us what matters and we'll scope it in.
- We walk the space first
- Written quote in 24h
- No long-term contract
Why Royal Clean Solutions
Why builders and property teams call us back
Trained, vetted crews
Every cleaner is background-checked and verified before they ever enter your space — and you get the same faces, not a rotating cast.
Built for Denver conditions
Winter salt and ice-melt tracking, summer dust, high-altitude allergens. We clean for what buildings on the Front Range actually face.
One point of contact
A dedicated account manager owns your schedule, your special requests and your quality — so you're never chasing a crew.
Quality you can verify
Documented checklists and routine QC inspections. If something's missed, we come back and re-clean it at no extra charge.
Scheduling that fits you
Daytime, after-hours, nightly or weekend. We work around your operations instead of interrupting them.
No long-term traps
Clear, transparent pricing and month-to-month flexibility. You stay because the work is good, not because you're locked in.
Our process
Phased to fit your programme
We work to your construction schedule — including the gaps between trades where the productive cleaning actually happens.
- 01
Site walk & scope
We assess the build, the finishes involved and your completion date, then map the cleaning phases to your trade schedule.
- 02
Rough clean
Debris, packaging and heavy dust removed so remaining trades can work in a clear space.
- 03
Final detail clean
Top-down HEPA detail on every surface, glass, fixture and floor using the correct method for each material.
- 04
Touch-up & handover
A final pass once trades are off site, then a snag walk with your contact so the space is signed off clean.
Our work
Recent results from Denver jobs.

New-build fit-out — final detail clean

Renovation handover, Denver metro

Commercial suite, inspection ready
What clients say
Reviewed by the people who let us in.
Real, unedited Google reviews from Royal Clean Solutions customers.
Based on 11 Google reviews
Post construction cleaning in Denver for new builds, fit-outs and renovations
There's a gap between a build being finished and a space being usable, and it's almost always filled with dust. Drywall particulate, sawdust, grout haze, adhesive residue, paint flecks, protective film and the fine grit that gets into every track and vent.
Royal Clean Solutions provides post construction cleaning services in Denver for residential new builds, commercial fit-outs, tenant improvements and full renovations. We work in phases that match how construction actually finishes — because a single clean at the end simply doesn't hold once another trade walks through.
The result is a space that passes inspection, photographs properly and can be handed over without a list of cleaning snags attached to it.
Why method matters more than effort on new finishes
Everything in a new build is on its first clean, and a lot of it is unforgiving. Scrape a paint fleck off new glass with the wrong blade angle and you've left a permanent scratch. Attack grout haze with an abrasive and you've dulled the tile. Use a general solvent on powder-coated aluminium and you've marked it.
Our crews are trained on surface-specific method: which chemical, which pad, which sequence, and which surfaces need protecting while adjacent work happens. It's the difference between a clean handover and a snag list of damaged finishes.
Questions, answered
Post-Construction Cleaning — the questions we get asked most.
How long does post construction cleaning take?
It depends on square footage, the finish level and how many phases you need. As a rough guide, a single-unit residential final clean is usually a day; a commercial fit-out of a few thousand square feet typically runs two to three days across the final and touch-up phases. We give you a firm duration with the quote after the site walk — not an estimate that expands later.
Is post construction cleaning safe for brand-new floors and surfaces?
Yes, when the method is right — and that's the whole point of using a specialist. We match chemical, pad and technique to each material: sealed and unsealed stone, engineered timber, LVT, polished concrete, stainless, powder-coated metal and new glass all need different handling. Using a general-purpose approach on new finishes is how permanent damage happens.
Do you handle multi-story or high-rise projects?
Yes. We work on multi-floor and high-rise projects and coordinate with your site team on hoist and lift access, floor-by-floor sequencing, waste routes and site safety requirements. Exterior high-level glass is scoped separately with the correct access method rather than assumed.
Will cleaning disrupt the remaining trades on site?
No — we schedule around them. In practice the most productive cleaning happens in the gaps between trades, and the touch-up phase is deliberately held until the last trade is off site. We'd rather work to your programme than force you to work around ours.
Do you remove construction debris as well?
We remove general construction debris, offcuts, packaging and protective materials to your designated waste point as part of the rough clean. Skip or dumpster provision and the disposal of hazardous materials sit outside our scope — we'll flag anything of that kind at the site walk so it's handled properly.
How do I schedule post construction cleaning in Denver?
Get in touch with your completion date and we'll arrange a site walk, then come back with a phased scope and price in writing — usually within 24 hours. Booking early is worth it: cleaning is the last thing on the programme and the easiest to get squeezed.
Still not sure?
Talk it through with our Denver team — no script, and a straight answer on price.
Keep exploring
Services that pair well with this one.
Ready when you are
Book your post-construction clean before the date slips.
Tell us your completion date and we'll phase the clean around your trades — with a written scope and price back within 24 hours.
- Written quote in 24h
- We walk the space before we price it
- No long-term contract



